Project scope included; Receving & loading of oversized loads, Multi-crane lifts, Manual and automated abrasive blasting, Application of primer and several coats of intumescent fireproofing to specified thickness/fire rating, Aesthetic/protective topcoat, Field touch-ups of block-outs for bolted connections.

Structural Steel Fireproofing

 
Previous
Previous

Towers